ADVERTISEMENT FOR BIDS

City of Fallon Court Street Reconstruction Project
  • Source: City of Fallon
ADVERTISEMENT FOR BIDS

      

PWP No. CH-2023-367

CDBG Grant No. 22/PF/08

 

Fallon, NV

Separate sealed Bids for the construction of the Court Street Reconstruction Project will be received by the City of Fallon, the Owner, at their administrative office located at 55 W. Williams Ave., Fallon, Nevada 89406 until 2:00 p.m., local time, on Thursday, June 8, 2023, at which time the Bids received will be publicly opened and read aloud. 

 

The Work consists of performing or providing all labor, services, and documentation necessary to produce such construction and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

 

The Work generally includes but is not limited to: Roadway reconstruction of approximately 775 linear feet of Court Street from E/S South Nevada Street to E/S South East Street, various concrete improvements, such as, replacement of existing or install new sidewalk, curb and gutter, residential and commercial driveway or approach improvements, valley gutters and spandrels, and ADA compliant pedestrian ramps at the affected intersections, utility adjustments to finish grade, storm drain improvements include new catch basins and lateral tie-ins to new infiltration chambers, water service and meter improvements, sanitary sewer main and lateral replacement, polymer sewer manholes, minor striping, and traffic control.

 

The Contract Documents may be examined at the following locations:

Owner:                                                        Issuing Office:

City of Fallon                                               Lumos & Associates, Inc.

55 W. Williams Ave.                                 178 South Maine Street       

Fallon, Nevada 89406                                Fallon, Nevada 89406

 

The Contract Documents may be examined and obtained on Thursday, May 18, 2023, at 10:00 AM at the following location:

 

ENGINEER: www.lumosinc.com/planroom  -  Plan Room (Hosted by Quest CDN)

 

A non-refundable deposit of $25.00 will be charged to log into the plan room to obtain each set of Plans and Contract Documents.

 

A pre-bid conference will be held at 2:00 p.m. local time on Thursday, May 25, 2023, at Fallon City Hall, 55 West Williams Avenue, Fallon, Nevada 89406. Attendance at the pre-bid conference is highly encouraged but is not mandatory.

 

This is a Federal-aid contract and the requirements for such shall apply. On a Federal-aid contract, any Contractor otherwise qualified by the State of Nevada to perform such work is not required to be licensed nor to submit application for license in advance of submitting a bid or having such bid considered. This does not constitute a waiver of the State’s right under its license laws to require a Contractor, determined to be a successful bidder, to be licensed to do business in the State of Nevada with a Class A prior to award of the contract.

 

Bid security shall be furnished in accordance with Section 00200, Instructions to Bidders.  Each Bid must be submitted on the prescribed form (separate Bid package) and accompanied by a certified check or Bid Bond in accordance with Section 00200.  Successful Bidders will be required to furnish both a Payment Bond and Performance Bond in the full amount of the contact price.

 

The Owner will not award the Contract to a Bidder who, at the time of submitting a Bid, was not properly licensed under the provisions of Chapter 624 of NRS or if the Contract would exceed the limit of the Bidder’s license.  Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders.

 

Owner: City of Fallon

By:        Brian Byrd

Title:     Public Works Director

Date:     May 18, 2023

+ + END OF ADVERTISEMENT FOR BIDS + +


Share
Rate

Comment

Comments

July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 1
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 2
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 3
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 4
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 5
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 6
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 7
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 8
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 9
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 10
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 11
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 12
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 13
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 14
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 15
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 16
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 1Page no. 1
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 2Page no. 2
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 3Page no. 3
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 4Page no. 4
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 5Page no. 5
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 6Page no. 6
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 7Page no. 7
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 8Page no. 8
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 9Page no. 9
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 10Page no. 10
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 11Page no. 11
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 12Page no. 12
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 13Page no. 13
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 14Page no. 14
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 15Page no. 15
July 4, 2025 -Fallon Gears Up for a “Bee-autiful”  - page 16Page no. 16
COMMENTS
Comment author: Mike HinzComment text: I knew Sam as a member of our church growing up. He always had a warm smile, a kind word, and a great sense of humor! He will be great missed!Comment publication date: 7/2/25, 11:57 AMComment source: Obituary -- Samuel Bruce WickizerComment author: Mike HinzComment text: Great teacher, great coach, but even a better person!!! Rest in peace Mr. BeachComment publication date: 7/2/25, 11:53 AMComment source: Obituary -- Jack Victor Beach, Jr.Comment author: Mike HinzComment text: I had Mrs Hedges for First Grade at Northside Elementary in 1969. I still, to this day, remember her as a wonderful teacher…one of my favorites!!Comment publication date: 7/2/25, 11:29 AMComment source: Obituary - Nancy Marie Hedges C Comment author: Carl C. HagenComment text: What are MFNs and PBMs ?? ............................ From the editor: This is a very good question and we apologize for not catching that wasn't in there. We reached out to the writer/submitter and got this info back...hope it's helpful. PBM: Pharmacy Benefit Managers are pharmacies that are owned by insurance companies. (CVS is one.) They negotiate with drug makers to get reduced pricing for medications, but they historically have not passed along those savings to patients. https://www.ftc.gov/system/files/ftc_gov/pdf/pharmacy-benefit-managers-staff-report.pdf MFN: Most Favored Nation pricing is a policy that means a country agrees to offer the same trade concessions (like tariffs or price reductions) to all member nations of the World Trade Organization (WTO). When applied to pharmaceuticals, it could disrupt global access, deter innovation, and obscure the deeper systemic issues in American health care. https://petrieflom.law.harvard.edu/2025/05/22/the-global-risks-of-americas-most-favored-nation-drug-pricing-policy/Comment publication date: 6/23/25, 7:47 AMComment source: L E T T E R TO THE EDITOR
SUPPORT OUR WORK